Beckman Institute Photo Gallery

BIC ISL Space Swap

BIC ISL Space Swap

ISL brought in the heavy equipment for the groundbreaking on the Cube addition at the south campus location. Their goal is to have the Cube up and running by the beginning of the spring semester.